Preparation a Second Story Addition

Posted on: November 12, 2023 by in Uncategorized
No Comments

Preparation a Second Story Addition

When dealing with a job that includes eliminating your roof, Planning is the technique.
Prior to you prepare your 2nd story, research study what barriers will require to be handled. Examples of products that require to be repaired are:
– Size of ceiling joists, can they support a 2nd story flooring covering?
– Are mechanicals run over the top of existing ceiling joists? (pipelines, electRic, HVAC).
– How much overhang is on existing roof and exist any energies safeguarded to it.
– Is the existing roof stick developed( developed on website) or a truss roof( made).
– Is the roof sheathing 1x boards or plywood?
– How good deals of layers of shingles exist?
– Are there any Stacks or flues extending through the roof such as a fireplace chimney, heating system flue, or vent pipeline.
These things require to be thought about so the addition can be developed as rapidly as possible.
When beginning the tearoff, the truly very first thing that requires to be addressedis the soffit. Eliminating this at initially will introduce up the rafter ends when it comes time to eliminate them.
Now you can tearoff the roof. The most fundamental method to get rid of the shingles and sheathing is with a circular saw. It’s finest to utilize an old blade with a lower quantity off teeth since it will be garbage when you are done.
When cutting the roof away, begin at the ridgeboard and run the saw in between the rafters all the method to the rafter tails. Repeat this cut every 32″ from one end of the roof to the other. These pieces, presuming they are plywood, can be gotten rid of in 32″ x 48″ squares.
If the roof sheathing is pieces, the cuts need to be made 48″ to 64″ apart. You ought to be able to roll these places down the rafters if there are 2 or mre layers of shingles.
As rapidly as the roof sheathing is eliminated, the rest of the parts canbe gotten rid of. As rapidly as that is gone the rafters can be gotten rid of.
After the sheathing is gotten rid of, much of the truss work will require to be gotten rid of. The only part left would be the bottom cable television service that holds up the drywall ceiling. Each scenario is various and what is utilized is spect by an engineer or designer.
The electrical (chance), pipelines and/or HVAC run over the top of the ceiling joists. Typically, the most useful method to manage this, is to develop a knee wall high enough for the brand-new flooring covering joists to clear these blockages.
When the deck is down, the walls, ceiling joists, and roof of your brand-new addition can follow.
Whatever circumstance may you have, outstanding preparation will make this taskeasier and quicker. When it comes to eliminating a roof, Time is of the essence. You wish to safeguard the existing structure and all of your vital possesions that are left within.
( c) 2005 Mike Merisko www.sawkerfs.com.

When it comes time to eliminate them, eliminating this at initially will release up the rafter ends. As rapidly as the roof sheathing is gotten rid of, the remainder of the parts canbe gotten rid of.

Eliminating this at initially will release up the rafter ends when it comes time to eliminate them. Time is of the essence when it comes to eliminating a roof.

After the sheathing is gotten rid of, much of the truss work will require to be removed. Time is of the essence when it comes to getting rid of a roof. Eliminating this at initially will release up the rafter ends when it comes time to eliminate them. When that is gone the rafters can be gotten rid of. Time is of the essence when it comes to getting rid of a roof.