When handling a task that consists of removing your roof, Planning is the method.
Prior to you prepare your 2nd story, research study what barriers will need to be managed. Examples of items that need to be fixed are:
– Size of ceiling joists, can they support a 2nd story flooring covering?
– Are mechanicals run over the top of existing ceiling joists? (pipelines, electRic, HVAC).
– How much overhang is on existing roof and exist any energies secured to it.
– Is the existing roof stick established( established on site) or a truss roof( made).
– Is the roof sheathing 1x boards or plywood?
– How bargains of layers of shingles exist?
– Are there any Stacks or flues extending through the roof such as a fireplace chimney, heating unit flue, or vent pipeline.
These things need to be considered so the addition can be established as quickly as possible.
When starting the tearoff, the genuinely extremely first thing that needs to be addressedis the soffit. When it comes time to remove them, removing this at initially will present up the rafter ends.
Now you can tearoff the roof. The most essential technique to eliminate the shingles and sheathing is with a circular saw. When you are done, it’s finest to use an old blade with a lower amount off teeth because it will be trash.
When cutting the roof away, start at the ridgeboard and run the saw in between the rafters all the technique to the rafter tails. Repeat this cut every 32″ from one end of the roof to the other. These pieces, presuming they are plywood, can be eliminated in 32″ x 48″ squares.
If the roof sheathing is pieces, the cuts require to be made 48″ to 64″ apart. If there are 2 or mre layers of shingles, you ought to be able to roll these locations down the rafters.
As quickly as the roof sheathing is removed, the remainder of the parts canbe eliminated. As quickly as that is gone the rafters can be eliminated.
After the sheathing is eliminated, much of the truss work will need to be eliminated. The only part left would be the bottom cable television that holds up the drywall ceiling. Each circumstance is numerous and what is made use of is spect by an engineer or designer.
The electrical (opportunity), pipelines and/or HVAC run over the top of the ceiling joists. Normally, the most helpful approach to handle this, is to establish a knee wall high enough for the new flooring covering joists to clear these clogs.
When the deck is down, the walls, ceiling joists, and roof of your new addition can follow.
Whatever scenario might you have, exceptional preparation will make this taskeasier and quicker. Time is of the essence when it comes to getting rid of a roof. You want to secure the existing structure and all of your essential possesions that are left within.
( c) 2005 Mike Merisko www.sawkerfs.com.

Removing this at initially will launch up the rafter ends when it comes time to remove them. As quickly as the roof sheathing is eliminated, the rest of the parts canbe eliminated.

When it comes time to remove them, removing this at initially will launch up the rafter ends. When it comes to getting rid of a roof, Time is of the essence.

Time is of the essence when it comes to getting rid of a roof. Removing this at initially will launch up the rafter ends when it comes time to remove them.

When cutting the roof away, start at the ridgeboard and run the saw in between the rafters all the technique to the rafter tails. When it comes to getting rid of a roof, Time is of the essence. Time is of the essence when it comes to getting rid of a roof. Removing this at initially will launch up the rafter ends when it comes time to remove them. Time is of the essence when it comes to getting rid of a roof.

Comments are closed.